All your Writing needs covered

assignment 3: voip part 1 (work breakdown structure)

Calculate the price
of
your order:

275 words
+
Approximate price
$ 0.00

assignment 3: voip part 1 (work breakdown structure) This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file. OverviewAs the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company’s campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) workstations. The project must be completed in ninety (90) calendar days starting on November 1. Deliverable 1: Summary (MS Word or open source equivalent) 1.     Write a one to two (1-2) page summary document in which you: a.    Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.). b.    Define a work breakdown structure and describe the methodology behind constructing one. Deliverable 2: WBS (MS Project or open source equivalent) 2.    Use Microsoft Project to create a WBS which: a.    Contains at least five (5) main tasks, one for each of the PMBOK® process areas. b.    Contains at least sixty (60) line items distributed in ten (10) or more work packages. c.    Contains Work Breakdown Structure Code for each task. d.    Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview. Deliverable one (1) of your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

«VPNEW»

Unlock your academic potential with Vintage-paper.com! Place your essay order today and experience top-notch writing services that guarantee academic success. Our expert writers are ready to craft customized papers that will exceed your expectations.Don't wait, order now and elevate your grades

Order Now

Basic features

  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support

On-demand options

  • Writer's samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading

Paper format

  • 275 words per page
  • 12pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, CHicago/Turabian, Havard)

Guaranteed originality

We guarantee 0% plagiarism! Our orders are custom made from scratch. Our team is dedicated to providing you academic papers with zero traces of plagiarism.

Affordable prices

We know how hard it is to pay the bills while being in college, which is why our rates are extremely affordable and within your budget. You will not find any other company that provides the same quality of work for such affordable prices.

Best experts

Our writer are the crème de la crème of the essay writing industry. They are highly qualified in their field of expertise and have extensive experience when it comes to research papers, term essays or any other academic assignment that you may be given!

Calculate the price of your order

You will get a personal manager and a discount.
We'll send you the first draft for approval by at
Total price:
$0.00

Expert paper writers are just a few clicks away

Place an order in 3 easy steps. Takes less than 5 mins.